Project Offgrid - Garage Build, Part 2
In the last part, most of the trench work was buried back up and the GridBoss and FlexBoss21 were mounted on the wall. This post picks up where that left off — getting the remaining panels mounted, running EMT, terminating cable, and getting temporary power back into the garage so I can actually finish the job.

